Construction 1/4/2001 (click on picture to
enlarge)
Special Thanks to Don Spice for contributing on-site
photographs. The last foundation is poured. This was
after the water was pumped for 2 to 3 weeks. The concrete is being
pumped because the trucks couldn't get too close to the excavation for
fear of the sides of the excavation sliding in.
Construction
1/11/2001 (click on picture to
enlarge)